Priced by the size of the grid you run.
Start with one site and core forecasting. Scale to multi-site detection and dispatch, or a full grid-wide deployment. Growth and Utility plans are scoped with you, because no two networks look alike.
Plans
- Core load forecasting, up to 48 h
- 15-minute resolution with confidence bands
- Basic threshold alerts
- Monthly accuracy summary
- Everything in Starter, horizon up to 7 days
- Peak demand detection with lead time
- Dispatch recommendations and approval workflow
- Full grid performance reports and API
- Renewable integration available as add-on
- Everything in Growth
- Renewable integration included
- Hierarchy reconciliation across the network
- Custom and regulatory report templates
- Dedicated onboarding and named engineer
Feature comparison
| Feature | Starter | Growth | Utility |
|---|---|---|---|
| Forecasting | |||
| Forecast resolution | 15 min | 15 min | 15 min |
| Forecast horizon | Up to 48 h | Up to 7 days | Up to 7 days |
| Sites / substations covered | 1 | Up to 50 | Grid-wide |
| Probabilistic bands (P10-P90) | |||
| Hierarchy reconciliation | |||
| Detection & dispatch | |||
| Peak demand detection | Basic threshold | ||
| Dispatch recommendations | |||
| Operator approval workflow | |||
| Renewable integration | Add-on | ||
| Reporting | |||
| Reporting depth | Accuracy summary | Full performance reports | Custom & regulatory |
| CSV / PDF export | |||
| REST API | |||
| Support | |||
| Onboarding | Guided self-serve | Assisted | Dedicated team |
| Support channel | Email & scheduled calls | Named engineer | |
Before you talk to us
What data do we need to get started?
Interval load data for each site, ideally 12 months at 15- or 30-minute resolution; three months is enough to begin. Prelko supplies weather data. Renewable integration also needs installed capacity and, where available, generation output.
Does Prelko integrate with our existing SCADA or EMS?
Yes, on a read-only basis. Prelko ingests data from SCADA historians, EMS, ADMS, BMS and meter data systems through standard exports, OPC UA or file transfer, and returns forecasts through the console, API or files. It never writes to control systems.
How long does onboarding take?
A Starter site is typically forecasting within a week of data arriving. Growth deployments usually go live in three to six weeks, and Utility deployments follow a backtest and shadow-run plan agreed at kickoff.
How is Growth and Utility pricing set?
By the number of sites or substations, the modules enabled and the level of onboarding and support. We scope it with you after a short technical call.
Can we move between plans?
Yes. Forecast history, reports and settings carry over when you move up a plan.
Get a scoped proposal for your network.
Tell us how many sites or substations you run and which modules you need. We come back with a plan and an onboarding timeline.